Designing Perth’s new Airport Line
For many visitors arriving in Perth, their first experience of Western Australia is a new 8.5 km Airport Line that connects the airport and the city’s eastern suburbs with the rest of the urban rail network.
GHD was the lead design consultant to Webuild-NRW Joint Venture for the new Forrestfield-Airport Link (now known as the Airport Line), which includes twin-bored tunnels under the Swan River, three new rail stations: Redcliffe, Airport Central and High Wycombe plus the creation of a grade-separated rail junction as well as rail-bus interchanges servicing suburbs in the adjacent areas.
We provided design coordination for the project and delivered the architecture, above and below ground structural engineering, building services, rail systems design, civil engineering and Building Information Modelling (BIM) for one of Western Australia’s biggest infrastructure projects. The BIM models reduced duplication, unexpected issues and clashes during design development. GHD also developed automated design processes for rail electrification systems and tracks.
Project Elements
Architecture services were provided by our integrated design studio GHDWoodhead and Weston Williamson + Partners.